Global Santafe Services
We carried out a lot of Services for Global Santafe rigs ( Welding – fitting –
Sandblasting – painting - supply certified manpower – rental equipments – fabrication
& installation of H.P pipe lines - ……. Etc ) such us:-
- Supply certified ABS sheet plat 5/8 in x 6.5 ft x 19.75 ft to rig AD-X according to
purchase order # P1906296 with cost of ( 69320.00 EGP ) in Dec 2009.
- Complete fabrication for Conductor drive deck with diagonal praises for rig AD-X with cost
of ( 155500.00 EGP ) in Apr 2010.
- Complete fabrication for BOP's transporting frame for rig CII according to purchase order #
P1968703 with cost of ( 221900.00 EGP ) in Apr 2010.
- Complete job of fabricating air compressor platform for rig 141according to purchase order
#0000046087with cost of ( 68500.00 EGP ) in July 2010.
- Complete fabrication for draw work lifting frame for rig AD-X according to purchase order
#0000144206 with cost of ( 45000.00 EGP ) in Nov 2010.
- Complete fabrication & installation for driller shilters for rigs ( 105 – 141 – 124 ).
- Complete fabrication & installation for drilling equipments storage area for rig 141.
- Complete fabrication for exhaust lagging platform for rig CII.
- Complete fabrication for mud collector drip pan for rig AD-X with cost of ( 48000 EGP ) in
July 2009.
- Fabricate & install chock and kill AFT hoses access for rig AD-X with cost of
(24800.00EGP) in July 2009.
- Fabricate stairways to rig AD-X according to PO#P1794905 with cost of ( 55500.00 EGP )
in July 2009.
- Complete fabrication for 81 ea ladder stairs for rig AD-X according to PO#0000144205
with cost of ( 141750.00 EGP ).
- Fabrication of pipe rack Samson post for rig 105 according to PO#P1494637 with cost of
(114100.00 EGP) in Jan 2009.
- Repairing & maintenance 4 each port camps in Abu-Rudis base according to PO#P1828848
with cost of (34500.00 EGP) in Nov 2009.
- Fabrication & installation for H.P cement line on rig 124 with cost of ( 90000.00 EGP ).
Transocean Mediterranean & Red Sea
We carried out a lot of Services for Transocean rigs ( Welding – fitting – Sandblasting
– painting - supply certified manpower – rental equipments – fabrication &
installation of H.P pipe lines - ……. Etc ) such us:-
- Complete fabrication & installation for new water pipe lines ( hot water – tap water – salt
water – laundry water – drain lines ) during operations on rig mercury according to purchase
order #P1146745 with cost of ( 254000.00 EGP ) in July 2007 & still working with 100%
efficiency till now.
- Complete fabrication & installation for AFT ballast tank#4 on rig mercury according to
purchase orders #P1223309 with cost of ( 142000.00 EGP ) in Dec 2007.
- Complete job of refurbishing hallway's band C lever for accommodation on rig mercury
according to purchase order #P1248053 with cost of ( 85400.00 EGP ) in NOV 2007.
- Complete job of repairing 12 each water tide door according to purchase on rig mercury
order #P1288161 with cost of ( 97200.00 EGP ) in Mar 2008.
- Complete job of refurbishing hallway's band C lever for accommodation on rig mercury
according to purchase order #P1248053 with cost of ( 85400.00 EGP ) in NOV 2007.
- Complete job of fabricating pipe line for salt water above cat no.2 on rig mercury according
to purchase order #P1231477 with cost of ( 26400.00 EGP ) in Mar 2008.
- Complete job of de sander input discharge piping on rig Comet according to purchase order
#1329205 with cost of ( 27100.00 EGP ) in Apr 2008.
- Supply a lot of piping objects such as ( elbows different sizes – nipples – Flux brazing –
flanges – Reducers ….. ) to rig Comet according to PO#P1389763 in Jun 2008.
- Complete job of fabricating & installing Strip tank on rig Comet during rig move in Brief
period according to purchase order #P1504160 with cost of ( 24300.00 EGP ) in Sep 2008.
- Complete job of fabricating & installing Surge tank on rig Comet during rig move in Brief
period according to purchase order #P1263862 with cost of ( 65200.00 EGP ) in Sep 2008.
- Renew the clinic room on rig Comet according to PO#P1455958 with cost of ( 41100.00
EGP ) in Oct 2008.
- Complete job of repairing 20 ft open top container on rig comet according to purchase order
#P1318491 with cost of ( 23400.00 EGP ) in Mar 2008.
- Supply trained , certified , & experienced manpower to rig Comet with cost of ( 41340.00
EGP ) in Apr 2006.
Iffco Egypt
We carried out some Services for Iffco Egypt ( Welding – fitting – Sandblasting –
painting – rental equipments – ……. Etc ) such us:-
Sandblasting & painting tanks from out side 2 coats & painting the site gate & drawing their
logo on tanks with cost of (110244.00 EGP) in July 2006.
Dubai ports world